Archive

A Busy Ship

Two cranes operate to mobilize and demobilize the R/V Revelle between Legs 1 and 2 of the UW-OOI-NSF Regional Cabled Array operations and maintenance cruise. Several tons of equipment will be off- and on-loaded during the two days in port. Credit: M. Elend, University of Washington, V17.

Read More »