Archive

R1715 Laying Cable at the Base of Axial Seamount

Axial Base PN3A. During ROPOS Dive R1715, a 1 km cable was installed at the base of Axial Seamount near Primary Node PN3A using the Remotely Operated Cable Laying System (ROCLS) mounted to the underbelly of ROPOS. Video credit: NSF-OOI/UW/CSSF; Dive R1715; V14.

Read More »